Well this week has been a bit of a setback. The welder informed me that he is booked solid the next week and then is going on a ten day hunting trip so he won't be able to get to welding the frame until Thanksgiving. I should be able to stay productive and get the electrical systems and treads done. I will probably have to set back my deadline to Christmas break (so probably around Dec 20).
With that said, I mounted the polyurethane sheet. I also mounted the bus bars and attached the solder lugs to the large 4 gauge battery cable. To do this, I clamped down the cable and the lug, heated the cable and lug with a blowtorch, and then once hot enough, I applied the solder with flux. | |